Do you have residents who want to charge their electric cars at home?

  • Kerbo Charge is a through-pavement channel that residents use to charge safely at home.

  • It contours with the shape of the pavement, unlike metal competitors.

  • We provide a licensing pack to cover maintenance and liability.

Woman walking over the Kerbo Charge channel

Proudly working with these councils across the UK

Specifically designed for local authorities

Slim and shallow cable channel

  • The Kerbo Charge channel can flex during fitting to remain flush with the surface of uneven or cambered pavements.

  • The channel is 32mm deep which means highways engineers only need to cut into the top tarmac layer.

    No additional foundation or footings are required - the unit is sealed in place with HAPAS approved mortar.

Patented self closing lid design

  • The Kerbo Charge lid snaps down shut behind the charging cable as it is inserted and removed.

    There are no magnets, springs or other serviceable parts.

  • The main body of the channel is made from polyvinyl chloride (PVC) - a high-strength thermoplastic, and the same material used in many modern pavement utility covers.

  • Typically only 2-4 kg of CO2 to produce 1 kg, and 100% recyclable via our closed loop recycling system.

Safe for all foot and vehicle traffic

  • BSI tested our product to withstand up to 3,600 kN/m2 pressure, over triple the highest truck tyre pressure.

    They also confirmed it meets the requirements for water tightness and durability set for public drainage channels.

“This transforms the electric vehicle charging experience, ensuring safety and convenience.

No more trip hazards, just a seamless blend of sustainability and practicality right at your doorstep.”

Denise Gaines, Executive Member for Highways

Kerbo Charge - a hassle free and zero cost pavement gully solution for local authorities

We’ve spent two years developing the ‘perfect’ gully solution. Co-designed with local authority (LA) partners, the design requirements are:

  • Highly reliable integrated self-closing lid - lid cannot be left open.

  • Zero cost for LA. The installation is 100% privately paid.

  • Tested by BSI to BS EN 1433 standard - exceeds 15kN load test.

  • Maintenance free - a single manufactured unit with no consumable parts.

“We've been working with Kerbo Charge to roll-out these channels, which are a really simple solution that stops wires trailing across the pavement and keeps things safe and convenient”

Ben Bradley MP, Leader of Nottinghamshire County Council

10 year product warranty

  • 10 year product warranty and three year labour warranty.

Designed and manufactured in the UK

  • Manufactured in England in a factory certified to ISO 9001:2008.

  • We operate a closed loop recycling system - we provide the install teams with pre-paid returns bags to send us the offcuts to be 100% recycled.

BSI tested to EN 1433

  • Successfully tested by BSI in February 2023 to BS EN 1433:2002 (Drainage channels for vehicular and pedestrian areas).

    Certificate available on request.

“We are delighted to have been selected to pilot this pioneering technology which will make owning an electric vehicle accessible to more of our residents.”

Cllr John Shuttleworth, Cabinet member for Highways, Durham County Council

What’s the product made from?

The main body of the channel is made from the same material used in modern pavement utility covers - calcium zinc stabilised polyvinyl chloride (uPVC) - a high-strength thermoplastic.

The advantages of rigid PVC are:

  • Significantly less CO2 is emitted during production compared to newly manufactured aluminium or steel (2 - 4 kg of CO2 to produce 1kg of PVC vs. 10 - 20 kg for aluminium).

  • It’s UV stable, has a 100 year life expectancy and is 100% recyclable. We operate a closed loop recycling system - we provide pre-paid returns bags to send us the offcuts to be 100% recycled.

  • It’s not a target for scrap metal resellers.

“This is a really innovative and exciting trial which could encourage people to make the switch to electric.”

Milton Keynes City Council Cabinet Member for Climate Action and Sustainability, Cllr Jennifer Wilson-Marklew

For your Highways Team - all the installation practicalities

  • The works are carried out by the local authority’s own highways contractor - therefore a Section 50 license is notionally internally granted.

    A visual survey is required before the works start to ensure the installation site is not close to a dropped curb, tree roots or a road turning.

    Further survey work is usually not required because the channel is only 32mm deep and so will sit above any buried utilities.

  • A license to use the product is granted to the resident. This sets out their responsibilities to operate the product correctly, and a requirement to take out cable trip cover with their car insurance.

    In the highly unlikely event of any accidents happening, liability sits with the resident, unless a product defect has occurred during the warranty period which has caused the accident, in which case it sits with Kerbo Charge.

  • The Kerbo Charge channel is 32 mm deep and it is not normally necessary to cut below the top asphalt layer of the pavement.

    A disc cutter makes two parallel cuts 50mm apart, and then a chisel is used to remove the asphalt between.

    The channel is cleaned out and a readily available hybrid polymer adhesive is inserted on the floor and sides of the channel.

    The Kerbo Charge trunking is now inserted and the flexible design means the base of the open channel does not need to be flat - the Kerbo Charge product flexes with the surface.

    The adhesive is touch dry in around 30 minutes and takes 24 hours to fully dry, so a works cover is left in place overnight and removed the next day.

    The entire installation process takes one hour.

    All work is carried out by the local authority’s existing highways contractor.

  • The homeowner is responsible for the costs of any maintenance work after the two year warranty expires, and they agree to this as part of the terms and conditions of purchase.

    The maintenance work is carried out by the existing licensed highways contractor of the local authority.

  • 10 year product warranty.

  • No maintenance is needed apart from occasional cleaning out of the channel by the resident.

    If repairs are ever needed (e.g. as a result of vandalism) then the channel is removed from the ground by cutting the polymer adhesive with a Stanley knife.

    A new channel is then secured in place using fresh adhesive.

    The whole process takes around 30 minutes.

  • The main body of the channel is made from calcium zinc stabilised PVC which has a 100-year life expectancy, and the hinge mechanism is rated to open and close at least 25 million times.

Why choose the Kerbo Charge cross-pavement channel?

The Kerbo Charge cable channel is built to withstand all vehicle and foot traffic - as this video explains.

Your residents are taking risks charging at home

The average cost of 3 - 22 kW public chargers is now 55p/KWH, meaning a single charge using a public charger can be around £25 more than at home (source: Zap Map).

Many residents are therefore taking risks and finding ways to charge at home. The pictures below show different ‘methods’ adopted by residents in different local authorities in the UK.

Floor trail

The most dangerous - without even a cable cover.

Lamppost dangle

Cable trailed out of top window, wrapped around lampost and dangled down to the car.

Partial cable cover

Cable covers reduce but do not eliminate the risk of tripping, but usually don’t cover the whole cable, and provide an obstacle to wheelchair users.

cars in traffic

Have you declared a climate emergency?

It’s likely that encouraging adoption of electric vehicles (EVs) will be a core part of your strategy, given 24% of UK CO2 emissions are from vehicle emissions.

What’s your strategy to encourage EV adoption for people with no off-street parking?

The conventional wisdom is that to drive faster adoption, the cost of EVs must come down and public charger availability must improve. We think there’s an important part missing.

Are public chargers a big part of your strategy?

With the average cost of the lowest cost chargers in the UK currently 56p/kWh (source: Zap Map), it costs more per mile to charge your car from public charge points than to fill with petrol!

So even if local authorities are able to offer a charger within five minutes of most residents, consumers can see that EVs cost more to buy and are not cheaper to run - this creates a big deterrent.

It’s time to innovate

Many consumers with no off-street parking will continue to be deterred from buying an electric car if the running cost is higher than a diesel or petrol car.

Therefore simply rolling out more public charge points is not going to encourage fast EV adoption in your local authority.

  • A driver that can only charge their car from public charge points typically pays 18p/mile, versus the driver of a petrol/diesel car that pays 15p/mile.

    Meanwhile a driver that can charge at home typically pays only 7p/mile.


    (Source: ZapMap)

  • Charging a 77kWH car using a ‘Slow’ neighbourhood charger typically costs £27.72 more for a single charge, compared to using an off-peak home tariff.

    Cost to charge a 77 kWH car from 20 – 100% using a 57p/KWH BP Pulse public charging point vs. cost to charge the same car using a 12p kW/H overnight tariff (Octopus energy). Prices correct July 2023.